CASTR Cost and Schedule Total Risk
- Define structure
- Enter base estimates
- Identify and triage risks
- Simulate and respond
A standalone application for probabilistic project cost and schedule risk analysis, with a particular focus on highway construction and infrastructure. Its workflow follows the risk-based estimating method taught in NHI Course 134205, and its scoring tables can be adapted to other agency standards.
What it does
- Takes a project from its structure and base estimate through risk identification, triage scoring, and a risk register.
- Runs Monte Carlo simulation of cost and schedule together, with seed control for reproducible runs.
- Sets contingency at a chosen budget percentile and shows what drives it with tornado and tail-driver analysis.
- Compares results before and after planned risk responses, so the value of a response can be weighed against its cost.
- Best suited for
- Estimators, project managers, and risk analysts preparing cost and schedule risk assessments for highway and other infrastructure projects, including workshop-based risk reviews.
- Platform
- Standalone Windows application with a local browser-based interface. It runs on your computer, not as a cloud service.